- Overview
- Our Advantages
- Detailed Photos
- Product Parameters
- Certifications
- FAQ
Basic Info.
Product Description
As mining equipment factory , we not only supply the new energy Electric machinery or vehicles , but also we give full solution to mining industry .
This pick up is especially adjusted by our production line , and equiped with our special power driving system , to make its performance stronger and more endurable in mining area .
It saves more than diesel pickup .
Generally we suggest our clients purchase this pickup together with other machines , we will give discount price for this vehicle .
Battery Power | |
Battery Type: | LFP Type |
Rated Capacity | 173 AH |
Voltage | 347 V |
Rated Energy | 60.16 KWH |
Energy Ratio | >150 WH/KG |
SOC working range | 8%~10% |
* Quick and efficient, available battery charging or swapping
*Strengthened power structure
* Maintenance free, oil-free, less electricity, zero emission
* Limited speed, anti-explosion and anti-collision to ensure safety
Item | Parameters | Item | Parameters |
Body (length x width x height) (mm) | 5560×1840×1830 | Front suspension type | Spiral spring of double wishbone |
Wheelbase (mm) | 3405 | Rear suspension type | Plate spring |
Front/rear tread (mm) | 1548/1548 | Tire specification | 265/65R17 |
Ground clearance (mm) | 215 | Speed km/h | 80 (adjustable speed limit) |
Item | Parameters | Item | Parameters |
Motor power | 110kw | Charging time | 80% charge in 1 hour |
Peak motor torque | 800Nm | Battery swapping structure | 5 minutes to swap the battery |
Max motor speed | 4000rpm | Gradeability | It can climb 30° slopes at full load |
Battery type | Lithium ion battery | Endurance mileage | 250km |
Battery level | 60kwh | Driving mode | Part-time 4WD (BorgWarner Transfer Case) |
Battery voltage | 347V | Maximum speed | 80km/h (adjustable speed limit) |
Aided driving | Collision warning (optional) | Battery maintenance | Reduce battery loss by battery swapping |
1: What kind terms of payment can be accepted?
A: For terms of payment, L/C, T/T could accepted
2: What certificates are available in Machinery?
A: For the certificate, we have CE, ISO, Gost, EPA(USA)CCC,
3: What about the lead time?
A: 30 days after receiving the deposit.
4: What about the warranty time?
A: 12 months after shipment or 2000 working hours, whichever occurs first.
5. What about the Minimum Order Quantity?
A: The MOQ is 1 pcs.
6. How long will it take for the electric charging ?
A: 2 hours
7. How long will it take for the electric charging ?
A: 2 hours
8. How long will it take for replacing the battery ?
A: 5~10 mins
For more detailed product information or for sound proposal for your mining ,please send email to me