Basic Info.
Model NO.
Non-standard parts
Raw Material1
Stainless Steel Carbon Steel Alloy Steel Silicon S
Surface
Electroplating, Spraying Polishing Galvanized
Surface 1
Polishing Galvanized Painting, Oxidation
Process
Hot Stamping Deep Drawing Forming Process
Process 1
Bending Welding Bend Weld
Other Name
Automotive Spare Parts
Transport Package
Carton Box, Wooden Case Plate, Based on Product
Specification
79*56*32
Trademark
MinZe
Origin
Quanzhou
Production Capacity
10000000PCS/Year
Product Description
Production description
We were supply the pipe for a lot of application such as auto engine lubrication system sump strainer
Customer first:
We control the quality by APQP,PPAP
CONCEPT:Why does it always seem that we have plenty of time to fix our problems once they occur, but never enough time to prevent the problems from happening by doing it right the first time? That was why we PFEMA and HISTORY LEARNING first for all the project.
Here was the list for the tooling of the welding bending stamping punching tube of specification as below ,for more information please contact us ,we will answer all we know to meeting customer requirement.
Production process
6S In workshop
Bending workshop
Welding workshop
Spot welding workshop
Stamping workshop
Turning workshop
Tooling workshop
Surface treatment workshop
Customer Guide and audit work at MFG facility
Delivery to xiamen dock
We now have 100 customers from all over the world.
We were supply the pipe for a lot of application such as auto engine lubrication system sump strainer
Customer first:
We control the quality by APQP,PPAP
CONCEPT:Why does it always seem that we have plenty of time to fix our problems once they occur, but never enough time to prevent the problems from happening by doing it right the first time? That was why we PFEMA and HISTORY LEARNING first for all the project.
Here was the list for the tooling of the welding bending stamping punching tube of specification as below ,for more information please contact us ,we will answer all we know to meeting customer requirement.
Mold Material | DC01,DC04,DC06 |
Tooling life Time | 100K times |
Tooling Material | 1) AL1060, AL6061, AL6061, AL5052 2) Steel, mild steel, SPCC 3) SS201, SS303, SS304, SS316, SS316L 4) SPTE, galvanized sheet 5) Brass, copper |
Surface Treatment | Anodized, powder coating, lacquer coating, black oxide |
Salt and spy test | From 72-480 h |
Size | 1) According to customers' drawings 2) According to customers' samples |
Drawing Format | step, dwg, igs, pdf |
Certificates | ISO 9001:2015 & IATF 16949 |
Payment Term | T/T, L/C, Trade Assurance |
6S In workshop
Bending workshop
Welding workshop
Spot welding workshop
Stamping workshop
Turning workshop
Tooling workshop
Surface treatment workshop
Customer Guide and audit work at MFG facility
Delivery to xiamen dock
We now have 100 customers from all over the world.
1. We have own factory and 80% of staff in our company worked for more than 10 years.
2. We provide a competitive price.
3. High precision, tolerance can be within ±0.01mm.
4. 14 years' export experience.
5. Small order also is welcomed.
6. We can also provide one-stop service, including mold and assembly.
7. NDA apply to all customers.
2. We provide a competitive price.
3. High precision, tolerance can be within ±0.01mm.
4. 14 years' export experience.
5. Small order also is welcomed.
6. We can also provide one-stop service, including mold and assembly.
7. NDA apply to all customers.