- Overview
- name
- Product Usage
- Quality Control
- On line Inspection
- Full Inspection
Basic Info.
Packaging & Delivery
Product Description
Overview
__________________________________________________________________________________
Hand overturning bucket type underground mining vehicle
1. Material: divided into ordinary carbon steel and stainless steel, ordinary carbon steel are made of ordinary cold-rolled steel plates; The stainless steel is made of 304 stainless steel, which is oil resistant, wear-resistant, and corrosion-resistant
2. Specification 1000 * 745 * 870mm
3. The rotating part of the mine car adopts UFC bearing seats, which are flexible and convenient for flipping during no-load and heavy-duty dumping.
4. The bottom of the mine car adopts high-strength 4-inch heavy-duty casters, and all vehicles adopt 2 directional+2 universal (with brakes).
5. The surface adopts electrostatic spray molding, which can be customized according to your needs.
6. The bottom side of the box adopts a 4-point stainless steel ball valve, which can freely control the flow of liquid.
7. The mine car truck is equipped with a safety lock hook to prevent overturning during transportation.
Incoming Inspection (Raw Material)
Visual check,dimension check,special testing
Identify posssbile deviations and make correspongding
corrctive measures
Avoiding defectives during the production
Full Inspection Before Shipment
In the flow we must 100% check out each piece
befeor delivery to confirm their is no chance to deliver
defected goods to customers
__________________________________________________________________________________
Q1. Are you a factory or a trading company?
We are a factory, welcome to visit our factory.
Q2. What kind of production services do you provide?
Mold manufacturing, die casting, CNC machining, stamping, injection molding, assembly and surface treatment.
Q3. What's the delivery date?
Mold: 3-5 weeks
Mass production: 3-4 weeks
Q4. How is your quality?
♦We have obtained ISO9001
♦Once the sample is passed, we will make the operating instructions.
♦We will check the products 100% before shipment.
Q5. How long will it take for us to get a quotation?
After receiving the detailed information (your 2D/3D drawings or samples), we will quote you within 2 days.
Q6. What are the elements of your quotation?
Drawings or samples, materials, surface treatment and quantity.