- Overview
- Product Description
Basic Info.
Product Description
The bottle cooling tunnel is applied to PET bottle carbonated drink, soft drink, soda drink, gas containing drink or beer filling production line packed in PET bottle or glass bottle or can.
For low-temperature carbonated drink filling, it can get up the temperature of low-temperature filling carbonated drink to normal temperature to eliminating the condensed water on the external wall of PET bottles, to keeping bottles dry and clean. So convenient to following-up labeling and packing processes.
2. Structure feature:
a. The main part is stainless steel frame-board structure
b. The tunnel spraying cleaning is continuous transmission
c. Main drive is frequency conversion and infinite speed, convey by plastic chain net or stainless steel chain net
d. Heat by coiled pipe hot vapor
e. Temperature control adopts PLC control film regulating valve
3. Main technical parameter:
Production Capacity | 1000-20000 (BPH) |
Heating temperature | Normal temperature |
Cooling time | 12-15 (min) |
Linear conveying speed | 100-550 (m/min) |
Width of mesh conveyor | 1.22 (mm) |
Vaport .Pressure | <0.4 (Mpa) |
Vapor consumption | 120 (kg/h) |
Water circulation volume | 9 (m3/h) |
Installed power | 7.55 ( kw) |
Dimension | 1000×1500×1700 (LxWXHmm) |
Weight | 2000 (KG) |
We are one of professional famous manufacturer for every kind of beverage producing, filling, packing machines.
We can make the machine with different capacity, bottle and cap according your need.
Welcome your inquiry to us, thank you so much!
Min order: 1 Set
Port: ShangHai Port
Payment term: L/C, T/T, WESTERN UNION
30% deposit by T/T, 70% balance by T/T before shipment.
Packing detail: Wooden case package or blanket cloth package.
Delivery time: 20-25 days after 30% T/T payment.
Service:
We will provide whole drawing for bottle mould. Free charge for design on the mould. We can help you install the machine; from setting machine, testing, and to check the machine is on the good working condition. The buyer pays the round air tickets and 80usd as salary per person per day.
Delivery time:
30 days upon deposit and approval to the bottle drawing.
Payment term:
For machine: 30% T/T deposit within five days after the contract is signed against invoice of the seller. The balance of 70% will be paid before shipment.
Guarantee:
We response for 12 months warranty for the machine, however, it without any human conduct. And provide one-year free spare part for client. And send engineer to client's company, help install the machine, teaching their staff operate the machine and also, we do have a private school which help our client sending their staff to china, help them training.
After sales service:
We will solve the problem by phone first ,and send the spare parts by DHL,Or if you need engineer in your factory ,you need pay travel expenses; hotels, airfares, meals and ground transportation and any other expenses related to installation and training at customers facility.