New Tie Removal Technology and Track Laying and Maintenance Equipment Railroad Tie Changer

Introducing the Railroad Tie Changer: our innovative new tie removal technology and track laying and maintenance equipment. Visit us at our factory for top quality products.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
JG-LT
Drive Type
Internal Combustion Drive
Bucket Capacity
0.1~0.5m³
Size
Small-Scale
Certification
ISO9001: 2000
Condition
New
Key Word
Sleeper Changer
Key Word 1
Tie Removal
Transport Package
Naked Packing
Specification
6100*2200*2650mm
Trademark
JINGGONG
Origin
China

Product Description

The structure is novel, the operation is simple, the sleeper replacement operation efficiency is high, the construction safety is high, and the practicability is stronger. Railroad sleepers are mainly replaced manually. Since the sleepers are made of reinforced concrete, the weight is as high as 400-500 kg. Manual sleeper replacement will have high labor intensity, low operating efficiency, and low construction safety. The problem. After adopting the new railway sleeper replacement machine, the operating efficiency reaches 40-50 sleepers/hour, which can reach 20 manual workers, greatly reducing the labor management cost and improving the operation safety.
New Tie Removal Technology and Track Laying and Maintenance Equipment Railroad Tie Changer
  8 tons chain excavator with sleeper changer max grabing weight 0.5 ~ 0.6 tons
This small crawler excavator is specially designed for the replacement of railway sleepers. The average Each pillow changing machine can replace 1.5 pillows per minute, which greatly reduces the labor management cost and improves the operation safety.

Length*width*height

6100*2800*2650mm

Rated Power

48KW

Machine weight

8000KG
 
New Tie Removal Technology and Track Laying and Maintenance Equipment Railroad Tie Changer

1. It has a compact structure, atmospheric appearance, stylish and beautiful appearance, more youthful vitality, light operation and good coordination.

2.Jingong Railway sleeper-changing machine is short and sophisticated, the scope of application of the venue is wider, the transfer is more convenient, the operation is simple, and the cost performance is high.

3.The operating efficiency after using the Jingong railway pillow replacement machine can reach 20 manual workers. 

4.The grab can be customized according to the actual width of your local sleepers.We provide more optional parts to complete more kinds of work. We provide a variety of work tools such as grabs, forks, pulverizers, etc. to meet your various application needs. In addition, a variety of fixtures are provided to optimize the performance of the machine. The auxiliary hydraulic lines are arranged on the base of the boom, making the auxiliary hydraulic circuit easier to install, thereby reducing the time, parts and costs required for installing work tools. 

New Tie Removal Technology and Track Laying and Maintenance Equipment Railroad Tie Changer

1.Strict quality management produce effective and stable products to meet customers' needs.

2. Strict detecting system and advanced inspection equipment.

3.Professional sales team, quality inspection & report, maritime logistics guidance.

4.We grants our clients a twelve-month-period or 2000-hours warranty for any machine purchased from us. 

5.We offer perfect facilities and comfortable environment and can provide training services to different users.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours